Skip to main content

Insured, guaranteed workmanship across Surrey and the South East

Onsite Sealants
Project gallery

Before and after, on real buildings

A cross-section of recent work: basements, roof terraces, balconies, warehouse floors and period facades. Every job photographed at the same points before and after.

Placeholder copyAll gallery images and project write-ups are placeholders. Replace with your own photographs and confirm client permission before publishing addresses.

  • Placeholder image: damp basement wall before waterproofing, Guildford project
    Before
    Placeholder image: finished dry basement room after waterproofing, Guildford project
    After
    Structural waterproofingResidential

    Basement conversion kept dry for a growing family

    Standing water and salting on the walls before work started. A Type C cavity drain system with a twin pump station now protects a finished habitable room.

    Location
    Guildford, Surrey
    Duration
    9 days on site
  • Placeholder image: failed flat roof covering before repair, Woking project
    Before
    Placeholder image: new liquid waterproofed roof terrace, Woking project
    After
    Liquid waterproofingResidential

    Leaking roof terrace above a kitchen extension

    Failed felt was letting water through to the ceiling below. Stripped back, re-boarded and finished with a cold-applied liquid membrane and new upstand detailing.

    Location
    Woking, Surrey
    Duration
    4 days on site
  • Placeholder image: perished balcony sealant before replacement, Reading project
    Before
    Placeholder image: freshly sealed apartment balcony, Reading project
    After
    Sealant applicationCommercial

    Forty-two apartment balconies resealed in one programme

    Perished perimeter sealant was tracking water into the flats below. Joints were cut out, primed and resealed block by block so residents kept access throughout.

    Location
    Reading, Berkshire
    Duration
    6 weeks, phased
  • Placeholder image: damaged warehouse floor joint before repair, Basingstoke project
    Before
    Placeholder image: repaired warehouse expansion joint, Basingstoke project
    After
    Commercial contractCommercial

    Warehouse expansion joints rebuilt around live operations

    Spalled joint edges were damaging forklift tyres. Repaired with an epoxy nosing and a traffic-grade joint sealant, all completed outside picking hours.

    Location
    Basingstoke, Hampshire
    Duration
    3 weekends
  • Placeholder image: eroded mortar joints on a period facade, Farnham project
    Before
    Placeholder image: repointed and protected period facade, Farnham project
    After
    Damp proofingResidential

    Victorian facade protected without changing its character

    Penetrating damp through open mortar joints. Repointed in a lime mortar, then treated with a breathable water-repellent so the wall can still dry outwards.

    Location
    Farnham, Surrey
    Duration
    12 days on site
What clients say

Work that holds up, and people who turn up

Placeholder copySwap these for real reviews once you have permission to publish names and locations.

  • They found the actual cause in twenty minutes after two other firms had guessed at it. The basement has been bone dry through two winters.
    Placeholder client nameBasement conversion, Guildford
  • Forty-two balconies resealed with residents still coming and going. Clear programme, no complaints, invoiced exactly as quoted.
    Placeholder managing agentApartment block, Reading
  • Worked three weekends around our picking operation so we never lost a shift. That flexibility is why we keep them on the framework.
    Placeholder facilities managerDistribution centre, Basingstoke
Your building next

Send us a photo and we will tell you what we see

A picture of the damp patch or the failed joint is usually enough for us to say what is likely going on and what a fix involves.